Del. no. Deliverable name WP no. Lead participiant Estimated personmonths Del.type[1] Security[2] Delivery (proj.month)
D1 Content Creation and Content Management

Appendix

WP1 IMAC 34 report Rest. 6
D2 The REGNET - System: Specifications and State of the Art

Appendix

WP1 ZEUS 72 report Pub. 6
D3 REGNET - Enterprise Engineering and Market Analysis

Appendix

WP1 VALT 19 report Pub. 6
D4 Available Content and Products

Appendix

WP2 IMAC 42,5 report Rest. 12
D5 REGNET - System: Version 1

Appendix

WP2 ZEUS 70 prototype Rest. 12
D6 System Services and Business Processes

Appendix

WP2 VALT 24 report Pub. 12
D7 Validation of the REGNET System operation & Preparation of the REGNET - Demonstration Phase

Appendix

WP3 IMAC 51 report FP5 15
D8 The REGNET - System: Version 2 WP3 VALT 34 prototype Rest. 15
D9 REGNET System operation

Appendix

WP4 TARX 55 report Rest. 24
D10 REGNET - Demonstration (Trial Service)

Appendix

WP4 VALT 20 prototype Rest. 24
D11 REGNET trial service and recommendations

Appendix

WP4 IAT 6 report Pub. 24
D12 Technology Implementation Plan

Appendix

WP5 MOT 20 report Rest. 24
D13 REGNET - Information Dissermination Activities

Appendix

WP6 SPAC 17 report Pub. 5
D14 REGNET - Quality Assurance System

Appendix

WP7 MOT 6 report Rest. 6
D15 Final Report

Appendix

WP7 AIT 6 report Pub. 24
D16 Project Presentation (Web Presence) WP7 AIT 6 Web Site Pub. 3
D17 Project Presentation (Fact Sheet) WP7 AIT 3 Fact Sheet Pub. 3
 
[1] A short, self - evident description e.g. report, demonstration, conference, specification, prototype...
[2]
Int. Internal circulation within project (and Commission Project Officer if requested)
Rest. Restricted circulation list (specify in footnote) and Commission PO only
IST Circulation within IST Programme participants
FP 5 Circulation within Framework Programme participants
Pub. Public document

 

 